CHEMICAL INDUSTRY

We are your solution from A to Z

Extension of the storage silos capacity for polypropylene

Sila na PP

IMPLEMENTATION: 03/2021–12/2022

CUSTOMER: ORLEN Unipetrol RPA, s.r.o.

INVESTOR: ORLEN Unipetrol RPA, s.r.o.

CAPEX COST: CZK 500 million

SCOPE OF WORKS:

EPC project

The project includes the construction of a battery of 22 storage silos. The total storage capacity after commissioning is 17,6 kt.

  • Project documentation
  • Steel structure
  • Installation of 22 pcs of aluminum silos for the storage of polypropylene
  • Construction civil part
  • Pneumatic conveying system
  • New substations including related technological facilities for the polypropylene distribution

 

LE 2008 visbraker recovery

IMPLEMENTATION: 2020 – 2021

CUSTOMER: UNIPETROL RPA, s.r.o.

INVESTOR: UNIPETROL RPA, s.r.o.

CAPEX COST: CZK 5,6 million

 

SCOPE OF WORKS:

design and engineering activities

  • Reconstruction of the concrete channel of the slope and oily water
  • Piping replacement of slope and oily water

 

 

 

 

 

Construction of new switchboards, heating including utilities in block 38

IMPLEMENTATION: 2020 – 2021

CUSTOMER: UNIPETROL RPA, s.r.o.

INVESTOR: UNIPETROL RPA, s.r.o.

CAPEX COST: CZK 6,45 million

SCOPE OF WORKS:

design, engineering, and construction activities

  • Reconstruction of the building and heating
  • Installation of new switchboards and utilities

 

 

 

 

 

Steam cracker extension – new furnace BA-111 (technical support)

IMPLEMENTATION: 2020

CUSTOMER: UNIPETROL RPA, s.r.o.

INVESTOR: UNIPETROL RPA, s.r.o.

CAPEX COST: CZK 0,54 million

 

SCOPE OF WORKS:

design and engineering activities

  • technical support in the preparation of tender documentation

 

 

 

 

Steam cracker extension – new furnace BA-111 (documentation for building permit)

IMPLEMENTATION: 2020

CUSTOMER: UNIPETROL RPA, s.r.o.

INVESTOR: UNIPETROL RPA, s.r.o.

CAPEX COST: CZK 600 million

SCOPE OF WORKS:

design and engineering activities

  • Documentation for building permission
  • Engineering activities to obtain building permits

 

 

 

 

 

Reconstruction of storage in SHP - feasibility study

IMPLEMENTATION: 2020

CUSTOMER: Spolek pro chemickou a hutní výrobu a.s.

INVESTOR: Spolek pro chemickou a hutní výrobu a.s.

CAPEX COST: CZK 0,54 million

 

SCOPE OF WORKS:

feasibility study

  • Feasibility study, including material specification and estimation of investment costs

 

 

 

 

 

 

Increasing the safety of chlorine gas routes between CHS Epi production units

IMPLEMENTATION: 2019

CUSTOMER: Spolek pro chemickou a hutní výrobu a.s.

INVESTOR: Spolek pro chemickou a hutní výrobu a.s.

CAPEX COST: CZK 0,48 million

SCOPE OF WORKS:

design and engineering services

  • Detail design documentation, including the budget
  • QRA analysis
  • HAZOP and SIL study

 

 

 

 

Condensate treatment

IMPLEMENTATION: 2019

CUSTOMER: Slovnaft a.s., Bratislava

INVESTOR: Slovnaft a.s., Bratislava

CAPEX COST: EUR 216 500

 

SCOPE OF WORKS:

design and engineering services

  • Design documentation for the building permit and respectively for change of IPPC
  • Engineering activities to obtain the opinions of concerned state administration bodies
  • Engineering activities to obtain a building permit and respectively change of IPPC
  • Detail design documentation, including the budget
  • HAZOP study

 

 

Modernization of the chlorine leakage disposal system

IMPLEMENTATION: 2019 – 2020

CUSTOMER: Diamo s.p., Stráž pod Ralskem

INVESTOR: Diamo s.p., Stráž pod Ralskem

CAPEX COST: CZK 3,48 million

SCOPE OF WORKS:

design and engineering services

  • Design documentation for the building permit
  • Engineering activities to obtain the opinions of concerned state administration bodies
  • Detail design documentation, including the budget
  • Analysis, risk assessment and determination of the safety level

 

 

Reconstruction of laboratories in building 1715

IMPLEMENTATION: 2018 – 2019

CUSTOMER: UNIPETROL RPA, s.r.o.

INVESTOR: UNIPETROL RPA, s.r.o.

CAPEX COST: CZK 6,75 million

 

SCOPE OF WORKS:

design, engineering, and construction services

  • Delivery and installation of laboratory furniture
  • Reconstruction of paving and tiling
  • Electrical wiring, water and waste distribution

 

 

 

 

 

Reconstruction of Sample Testing Hall

ORLEN Unipetrol RPA s.r.o. – Rekonstrukce aplikační haly

IMPLEMENTATION: 2018 – 2019

CUSTOMER: UNIPETROL RPA, s.r.o.

INVESTOR: UNIPETROL RPA, s.r.o.

CAPEX COST: CZK 20 million

SCOPE OF WORKS:

design, engineering, and construction services

  • Steel structure – ceiling reinforcement
  • Civil works
  • Electro works
  • Air conditioning
  • Technology of machines cooling in the Sample Testing Hall
  • Reconstruction of technical gas distribution

 

Extension of PS 601 H13 Crude oil storage tank in town Nelahozeves - supervision

IMPLEMENTATION: 2018 – 2020

CUSTOMER: MERO ČR, a.s.

INVESTOR: MERO ČR, a.s.

CAPEX COST: CZK 500 million

 

 

 

 

 

 

SCOPE OF WORKS:

engineering services – supervision

  • Quality
  • Assembly
  • Welding
  • Geotechnics
  • Electro works
  • Coatings and corrosion protection
MERO ČR, a.s. – Rozšíření CTR v Nelahozevsi

Engineering services - PE3 ISBL

Inženýrské služby – PE3 ISBL

IMPLEMENTATION: 2016 – 2019

CUSTOMER: Technip Italy

INVESTOR: UNIPETROL RPA, s.r.o.

CAPEX COST: CZK 9 billion

SCOPE OF WORKS:

engineering services

  • Assessment of detail design documentation – statics, fire safety equipment (FSE)
  • Documentation for the change of the building before completion – fire safety equipment
  • Author’s supervision – installation of fire safety equipment

 

Engineering services - PE3 OSBL

IMPLEMENTATION: 2016 – 2019

CUSTOMER: ORLEN Projekt S.A.

INVESTOR: UNIPETROL RPA, s.r.o.

CAPEX COST: CZK 1 billion

SCOPE OF WORKS:

engineering services

  • Coordination of individual parts of OSBL
  • Planning, construction progress control
  • Review of technical documentation
  • Quality control

 

 

New Methanol Production Unit – Charleston WV, USA

Poradenství při výstavbě jednotky na výrobu Metanolu

IMPLEMENTATION: 2018 – 2020

CUSTOMER: US Methanol LLC

INVESTOR: US Methanol LLC

 

 

 

 

 

 

 

SCOPE OF WORKS:

Organizational, technical and commercial support of the project

Construction of PE 3 – OSBL

IMPLEMENTATION: 2016 – 2020

CUSTOMER: UNIPETROL RPA, s.r.o.

INVESTOR: UNIPETROL RPA, s.r.o.

CAPEX COST: CZK 8.5 billion

SCOPE OF WORKS:

EPC project:

  • Detail design
  • Civil works (pumping station switch room, excavation works,foudations…)
  • Piping systems (until DN 1200)
  • Implementation of connection points (hot tap)
  • Electro works
  • HVAC
  • Manufacture and assembly of 300 t steel structures
  • Pump assembly

 

Výstavba PE3 – OSBL

PIPING REPLACEMENT - 5610-NP002 - FILLING OF MONA2 PRODUCT (engine diesel)

IMPLEMENTATION: 2016 – 2019

CUSTOMER: UNIPETROL RPA, s.r.o. – RAFINÉRIE

INVESTOR: UNIPETROL RPA, s.r.o. – RAFINÉRIE

CAPEX COST: CZK 4.95 million

SCOPE OF WORKS:

EPC project:

  • Piping and valves supply
  • Piping DN200 and DN150 installation
  • Start up

PIPELINE OF MP STEAM

IMPLEMENTATION: 2017 – 2019

CUSTOMER: G – Team, a.s.

INVESTOR: UNIPETROL RPA, s.r.o.

CAPEX COST: CZK 8.5 billion

SCOPE OF WORKS:

engineering and supply activities:

  • Steel constructions
  • Pipeline construction

NEW BOILER ROOM FOR STEAM CRACKER

IMPLEMENTATION: 2017

CUSTOMER: UNIPETROL RPA, s.r.o.

INVESTOR: UNIPETROL RPA, s.r.o.

CAPEX COST: CZK 1 billion

SCOPE OF WORKS:

Design and engineering activities in the scope:

  • Design Documentation for Building Permit
  • Ensuring the negotiations of the Building Permit
  • Documentation with state administration bodies
  • Analysis and Risk Evaluation as per the Law No 224/2015 – Severe Accident Prevention)
  • Documentation issued in English

PART OF OSBL PART OF THE POLYETLYNE PLANT

IMPLEMENTATION: 2017 – 2018

CUSTOMER: Kovoprojekta Brno a.s.

INVESTOR: UNIPETROL RPA, s.r.o.

CAPEX COST: CZK 8.5 billion

SCOPE OF WORKS:

Engineering and supply activities in the scope:

  • Pipe bridges
  • Roads
  • Piping systems
  • Foundation for tank H01C
  • OSH
Part of OSBL Part of The PE Plant – Inženýrská, dodavatelská činnost

UNIPETROL RPA – STEAM CRACKER RECOVERY

UNIPETROL RPA – Obnova Etylenové jednotky

IMPLEMENTATION: 2015 – 2016

CUSTOMER: UNIPETROL RPA, s.r.o.

INVESTOR: UNIPETROL RPA, s.r.o.

CAPEX COST: CZK 1.65 billion

SCOPE OF WORKS:

Engineering and design activities:

  • Zoning proceedings documentation
  • Building permit documentation
  • Building programme public-law discussion
  • Project management
  • Investor´s technical supervision
  • Preparation of the structure to be incorporated in the long-term tangible assets

EXPANSION OF THE PRODUCTION LINE OF PP COMPAUNDAS

IMPLEMENTATION: 2017 – 2018

CUSTOMER: KLEMENT, a.s.

INVESTOR: INNO-COMP BOHEMIA, s.r.o.

CAPEX COST: CZK 21.97 million

SCOPE OF WORKS:

Design, engineering and supply activities:

  • Building foundations for technology
  • Connection of technological distributions
  • Civil part construction
  • Project management
  • Quality mangement
  • Supervision
  • As-built documentation control
Výrobní linka na PP kompaundy – Projekční, inženýrská a dodavatelská činnost

2018 - SHUT DOWN OF PLANT - REFINERY KRALUPY

Zarážka 2018 v Kralupech – Inženýrská činnost

SCOPE OF WORKS:

Engineering activities:

  • Technical supervision – machine part
  • Technical supervision – civil part
  • Technical supervision – electro and I &C part

IMPLEMENTATION: 2018

CUSTOMER: UNIPETROL RPA, s.r.o. – RAFINÉRIE

INVESTOR: UNIPETROL RPA, s.r.o. – RAFINÉRIE

CAPEX COST: CZK 0.7 billion